Truckee River Legacy Trail

Truckee River Legacy Trail

In 2015, the Town of Truckee adopted the updated Truckee Trails and Bikeways Master Plan, which provides detailed guidelines for the development of over 35 miles of paved trails (Class I) and 60 miles of bike lanes (Class II) within the Town. The plan identifies the Truckee River Legacy Trail as a high priority trail. When complete, the Truckee River Legacy Trail will connect the Donner Memorial State Park to the Glenshire neighborhood. The majority of the route will parallel the Truckee River. Phases 1, 2, 3A, 3B, 4A and a portion of 5 through the Mousehole are completed.

Phase 4B

The last remaining section to be completed, Phase 4B will connect the end of Phase 4A with a bridge across the Truckee River and connection to the intersection of Highway 89 South and West River Street. This portion of the trail will include a trailhead parking lot on West River Street.

View a full size version of the Truckee River Legacy Trail Phase 4 map (PDF)

Additional questions can be directed by emailing Project Manager, Jessica Thompson, Senior Civil Engineer or call her directly at 530-582-2938.

Link to Initial Study Negative Declaration for Truckee River Legacy Trail and Geotechnical review documents.