Modular and Kit ADUs
ADU Construction Methods
The primary construction methods used to create a new detached accessory dwelling unit (ADU) are the following:
- Site-Built / Stick-Built: Traditional type of construction where nearly all components are constructed on site. This is generally the most customizable and expensive method of construction.
- Modular: Prefabricated structure built offsite in a climate-controlled factory and transported as a complete building or in modules to be installed via crane onto a permanent foundation.
- Kit/Panelized: Prefabricated kit, typically including pre-cut walls, floors, and roof panels, manufactured offsite and shipped for onsite assembly by the homeowner or licensed contractor.
Benefits of Prefab ADUs:
Prefabricated (“prefab”) construction, including modulars and kits, is a valuable tool that can reduce ADU overall construction time and typically reduces project costs through a streamlined design and building process. Homeowners can decide what they want based on their budget, timeframe, and aesthetic preferences. To learn more about modular construction, click here to read a Keep Truckee Green article about modular construction and sustainability.
Purpose of this List:
Due to high/unpredictable costs and severe weather impacts associated with site-built construction in the Truckee region, homeowners often request prefab options; however, it is hard to find modular and kit ADUs that can work in Truckee, primarily due to our high snow load requirements (170 to 480+ PSF ground snow load). After researching countless modular and kit manufacturers, Truckee’s ADU team interviewed the prefab companies below based on their stated interest and ability to provide ADU models that meet Truckee’s high snow loads, Wildland-Urban Interface (WUI) codes, building codes, and Truckee’s other design criteria. The information below was provided directly from each manufacturer with permission to share on our website.
Disclaimer: This is an informational resource only. This is not an endorsement or recommendation for any of these companies by the Town of Truckee. If you are interested in any of these companies, please reach out to them directly at the contact information provided. If you are a modular or prefab ADU company and wish to be added to this list, please email housing@townoftruckee.com.
The companies below are listed in alphabetical order:
California Modulars / Clever Homes / CFS Building Systems / Method Homes / Perpetual Homes / Q Cabin / Studio Shed
California Modulars, Gilroy, California
Justin Montoya, Sales, 408-896-1220, www.californiamodulars.com
What's Included
| Building Plan Set | Optional |
| Building Permit Package | Optional |
| Site Work | Optional |
| Solar PV Design | Optional |
| Title 24 Energy Calculations | Optional |
| Fire Sprinkler Design | Optional |
| Foundation Installation | Optional |
| ADU Installation | Optional |
| Utility Connections | Optional |
| Finish Work | Optional |
Price
$400 per square foot
Timeline
3 months
Sizes Available
150 - 1200 square feet
Snow Load
170 PSF - 415+ PSF: Most models can be customized to meet snow load requirements
Wildland-Urban Interface Ignition Resistance
Meets California construction regulations
Customizable
Yes, almost everything.
Clever Homes, Oakland & Kings Beach, California
Toby Long, AIA NCARB, 415-905-9030 ext. 1, www.cleverhomes.net
"We approach prefabrication uniquely by working through a design process with our clients to align their goal, objectives, and budgets, and by working with a market of fabricators who will provide a competitive process for pricing and scheduling."
- 1 A wooden ADU at night with a big covered deck
- 2 A wooden and blue home with a stone chimney in the snow
- 3 An overhead view of a white ADU with a pool
- 4 A large black and wood home in the forest at sunset
- 5 A black and wood flat topped home with a deck with two tables
- 6 A wood home with large windows and a fire pit out front
What's Included
| Building Plan Set | Included |
| Building Permit Package | Included |
| Site Work | Included |
| Solar PV Design | Included |
| Title 24 Energy Calculations | Included |
| Fire Sprinkler Design | Included |
| Foundation Installation | Included |
| ADU Installation | Included |
| Utility Connections | Included |
| Finish Work | Included |
| Anything Else | Coordinate the entirety of the experience from concept to completion. |
Price
The likely range of cost for the project will be between $600 - $800 per square foot.
Timeline
Varies, but most fabrication schedules are 12-16 weeks.
Sizes Available
150 - 1200 square feet
Snow Load
170 PSF - 415+ PSF: All projects
Wildland-Urban Interface Ignition Resistance
Meets California construction regulations
Customizable
Yes, there are no limitations or restrictions. Clever Homes can work with any design and specification requirements.
Method Homes, Seattle, Washington
"We have a custom predesigned ADU specifically for the Truckee area."
What's Included
| Building Plan Set | Included |
| Building Permit Package | Included |
| Site Work | Unavailable |
| Solar PV Design | Optional |
| Title 24 Energy Calculations | Included |
| Fire Sprinkler Design | Included |
| Foundation Installation | Unavailable |
| ADU Installation | Included |
| Utility Connections | Unavailable |
| Finish Work | Included |
| Anything Else | Provide comprehensive preconstruction services, detailed estimation and coordination with the local GC team. |
Price
$275,000 modular, $60,000 delivery and set, $40,000 preconstruction
Timeline
6 months
Sizes Available
500 - 1200 square feet
Snow Load
170 PSF - 415+ PSF
Customizable
Yes, owners can select their finishes and appliances with skilled inhouse interior design and specifications team.
Perpetual Homes, Danville, California
Kathy Anderson, Founder, 925-980-2351. www.perpetualhomesadu.com
What's Included
| Building Plan Set | Included |
| Building Permit Package | Included |
| Site Work | Included |
| Solar PV Design | Optional |
| Title 24 Energy Calculations | Optional |
| Fire Sprinkler Design | Optional |
| Foundation Installation | Included |
| ADU Installation | Included |
| Utility Connections | Included |
| Finish Work | Included |
Price
$450 per square foot
Timeline
4-5 months
Sizes Available
500 - 749 square feet
Snow Load
Up to 200 PSF: Container Product Line
Wildland-Urban Interface Ignition Resistance
Meets California construction regulations
Q Cabin, Chico California
Vern Sneed, www.theqcabin.com
What's Included
| Building Plan Set | Included |
| Building Permit Package | Included |
| Site Work | Optional |
| Solar PV Design | Unavailable |
| Title 24 Energy Calculations | Included |
| Fire Sprinkler Design | Optional |
| Foundation Installation | Optional |
| ADU Installation | Optional |
| Utility Connections | Unavailable |
| Finish Work | Optional |
Price
Depending on snow load conditions, <$299,600
Timeline
5 weeks
Sizes Available
150 - 1200 square feet
Snow Load
170 PSF - 349 PSF: All models
350 PSF - 415+ PSF: The Mountaineer Model
Wildland-Urban Interface Ignition Resistance
Meets California construction regulations
Customizable
Every aspect is customizable.
Studio Shed, Louisville, Colorado
Stuart Prudden, Customer Experience Representative, Direct: 720-204-2635, Office: 888-900-3933, sprudden@studioshed.com, www.studioshed.com
"Since 2008, Studio Shed has changed the way we think about our living space and redefined a category along the way. We are a national leader in the rapidly growing market of smart, well-designed, prefabricated backyard structures."
What's Included
| Building Plan Set | Included |
| Building Permit Package | Optional |
| Site Work | Optional |
| Solar PV Design | Unavailable |
| Title 24 Energy Calculations | Included |
| Fire Sprinkler Design | Unavailable |
| Foundation Installation | Optional |
| ADU Installation | Optional |
| Utility Connections | Optional |
| Finish Work | Optional |
Price
For Included: +/- $200 per square feet
For Included + Install & Finish: +/- $340 per square feet
For Included + All Optional: +/- $420 per square feet
Timeline
Varies, most projects complete in less than three months from breaking ground.
Sizes Available
150 - 1000 square feet
Snow Load
170 PSF - 249 PSF: Summit 300, Summit 500, Summit 600
250 PSF - 349 PSF: Summit 300, Summit 500
350 PSF - 414 PSF: Coming soon
Wildland-Urban Interface Ignition Resistance
Meets California construction regulations
Customizable
Yes, Preset, selectable options for window and door quantities and locations. Preset, selectable options for floor plans. Siding materials and colors. Trim/window/roofing colors. Interior color selections - Flooring, cabinets, countertops.
If you are a modular or prefab ADU company and wish to be added to this list, please email Lynn Baumgartner.