Show/Hide

The best resource for Coronavirus Updates and Preparedness in Nevada County at  https://www.mynevadacounty.com/2924/Coronavirus.

Truckee River Legacy Trail

Print
Press Enter to show all options, press Tab go to next option

In 2015, the Town of Truckee adopted the updated Truckee Trails and Bikeways Master Plan, which provides detailed guidelines for the development of over 35 miles of paved trails (Class I) and 60 miles of bike lanes (Class II) within the Town. The plan identifies the Truckee River Legacy Trail as a high priority trail. When complete, the Truckee River Legacy Trail will connect the Donner Memorial State Park to the Glenshire neighborhood. The majority of the route will parallel the Truckee River.  Phases 1, 2, 3A, 3B, an a portion of 5 through the Mousehole are completed.

Truckee River Legacy Trail Phase 4 

Phase 4 (currently in its planning and design phase) will connect the Truckee Regional Park through the Hilltop development, south of the Truckee River, to SR 89 South by West River Street. 

Link to Initial Study Negative Declaration for Truckee River Legacy Trail and Geotechnical review  documents.

TRL_Alt_Exhibit_Strip Map-36x1201-5-17

 

Phase 5 will connect Phase 4 to the Donner State Memorial Park along SR 89 and Deerfield Drive and through the Planned Community 1 (Coldstream Specific Plan) development.

If you have any questions regarding the Truckee River Legacy Trail Project, please contact Jessica Thompson, Senior Civil Engineer, directly at (530) 582-2938 or by email here.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer