Design

Print
Press Enter to show all options, press Tab go to next option

Phase 1 of the project extends from Richards Boulevard to Frates Lane/ State Route 89 South: construction of new sidewalks in 2019 where they currently do not exist, and providing pedestrian islands at multiple crosswalk locations.  The overall planning process will also include Donner Pass Road from Frates Lane to the McIver roundabout as proposed future projects.  Shown below are the proposed Phase 1 Project for the western segment (Richards Blvd. to Frates Ln.) and potential future project phases for this section of the corridor. Western Segment Utility Undergrounding Project and the Northwoods Boulevard/ Donner Pass Road Roundabout are slated for construction in 2018 and 2020 respectively.

Envision DPR Exhibit Project Area Board 

 

Envision DPR Exhibit Project Area Board