In 2012, the Town of Truckee adopted the updated Truckee Trails and Bikeways Master Plan, which provides detailed guidelines for the development of over 130 miles of trails and bikeways within the Town. The plan identifies the Truckee River Legacy Trail as a high priority trail. When complete, the Truckee River Legacy Trail will connect the Donner Memorial State Park to the Glenshire neighborhood. The majority of the route will parallel the Truckee River.

There are several interpretive signs along the trail. Click here to view those that are available. 

Truckee River Legacy Trail Phases 1, 2 and 3A

Phase 1 and 2 of the Truckee River Legacy Trail was completed in the summer of 2009. This segment links the Truckee Regional Park to the Riverview Sports Park, with connections to East River Street and Ranch Way. Phase 3A connects Phase 2 at the Riverview Sports park to an overlook to an historic site just west of the TTSA plant and was completed in 2010.

 Legacy 2

Phase 2 of the Truckee River Legacy Trail

Truckee River Legacy Trail Phase 3B

Phase 3B of the Truckee River Legacy Trail connects Phase 3A to the Glenshire Subdivision. Over 2 miles of trail travel from the existing Phase 3A trail, between the Tahoe-Truckee Sanitation Agency Waste Water Treatment Plant and the Truckee River, across Martis Creek, up the talus slope, along an existing utility access road, and to Glenshire Drive. The trail travels south of the Truckee River through property owned by the USFS, Tahoe-Truckee Sanitation Agency, and Town of Truckee.

Truckee River Legacy Trail Brochure

Truckee River Legacy Trail Phase 3B Questions and Answers

 TRLT 3b Seg

Truckee River Legacy Trail Phase 3B Segment

View from 3B

View from Proposed Phase 3B Segment  

Truckee River Legacy Trail Phase 4 and Phase 5

These future phases of the Truckee River Legacy Trail would consist of the following segments:

  • Phase 4 would connect the Truckee Regional Park through the Hilltop development, south of the Truckee River, to SR 89 South by West River Street.

    TRL_Alt_Exhibit_Strip Map-36x1201-5-17
  • Phase 5 would connect Phase 4 to the Donner State Memorial Park along SR 89 and Deerfield Drive, and through the Planned Community 1 (Coldstream Specific Plan) development.

If you have any questions regarding the Truckee River Legacy Trail Project, please contact Jessica Thompson, Senior Civil Engineer, at (530) 582-2938 or jthompson@townoftruckee.com.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer